Performing maintenance
VMU 1 ATEX II 2G IIC T4
en(us)
Page 39 / 60
BEWA VMU _4_ATEX-II2GIICT4_4066057 en-us 2015-10-12.doc
2015-10-12
Depressurizing
Carry out the depressurization first via the air bleed screw (1). Then open the
drain ball valve (2) and collect the escaping fluid with a suitable container.
The visual back-pressure indicator
shows the pressure in the housing.
Do not open the housing until you
have depressurized it and the
pressure gauge shows no pressure.
Содержание VarnishMitigation Unit
Страница 59: ......