Performing maintenance
VMU 1 ATEX II 2G IIC T4
en(us)
Page 48 / 60
BEWA VMU _4_ATEX-II2GIICT4_4066057 en-us 2015-10-12.doc
2015-10-12
Replacing the filling level limit switch
When replacing the filling level limit switch (7), observe the position of the
sensors (A). Align the sensor (A) parallel to the direction of flow.
Содержание VarnishMitigation Unit
Страница 59: ......