i
TABLE OF CONTENTS
SECTION 0 - SAFETY INSTRUCTIONS
SUMMARY .......................................................................................................................................0.1
BASIC RULES ..................................................................................................................................0.3
SAFETY HAZARD LABELS .............................................................................................................0.6
LOCATION AND PART NUMBERS OF SAFETY HAZARD LABELS ON V-25APC ........................0.8
SECTION 1 - INSTALLATION
SAFETY CONSIDERATIONS ..........................................................................................................1.1
V-25 APC LIFTING AND SHIPPING.................................................................................................1.2
LEVELING THE V-25 APC ...............................................................................................................1.3
BARFEED INSTALLATION ..............................................................................................................1.4
CONVEYOR INSTALLATION (OPTIONAL) ....................................................................................1.12
OUTFEED CONVEYOR ..................................................................................................................1.12
INFEED CONVEYOR ......................................................................................................................1.12
POWERED CONVEYORS (REFER TO ELECTRICAL SCHEMATICS) .........................................1.12
CUTTING FLUID .............................................................................................................................1.13
HYDRAULIC OIL .............................................................................................................................1.13
WIRING CONNECTIONS ................................................................................................................1.13
BLADE TENSION CHECK ..............................................................................................................1.13
EARTH GROUNDING PROCEDURE .............................................................................................1.14
SECTION 2 - OPERATING INSTRUCTIONS
E300 INTERFACE OPERATION INSTRUCTIONS ..........................................................................2.1
MANUAL MODE ONLY CONTROLS ...............................................................................................2.2
MANUAL & AUTO MODE CONTROLS ............................................................................................2.2
MACHINE & CYCLE CONTROLS ....................................................................................................2.3
OPTIONAL EQUIPMENT CONTROLS ............................................................................................2.4
MANUAL MODE ...............................................................................................................................2.5
COLLISION DETECTION FEATURE ...............................................................................................2.6
PARAMETERS .................................................................................................................................2.7
OPENING THE FRONT GATE IN MANUAL AND AUTOMATIC MODE ...........................................2.9
ONE CUT MODE OPERATION .......................................................................................................2.10
AUTOMATIC OPERATION ..............................................................................................................2.10
SEQUENCE OF OPERATION ........................................................................................................2.12
MECHANICAL CONTROLS ............................................................................................................2.13
HEAD FORWARD LIMIT SETTING ................................................................................................2.13
HEAD BACK LIMIT SETTING .........................................................................................................2.13
OUT OF STOCK COLLAR ..............................................................................................................2.14
COOLANT FLOW ............................................................................................................................2.14
PRIMING THE COOLANT PUMP ...................................................................................................2.14
RESTRICTIONS - HEAD SWING LEFT ..........................................................................................2.14
Содержание V-25APC
Страница 2: ......
Страница 13: ...0 9 ...
Страница 16: ...0 12 ...
Страница 59: ...4 1 ELECTRICAL SCHEMATICS SEE PDF ON ATTACHED CD SECTION 4 ELECTRICAL ...
Страница 60: ......
Страница 63: ...6 1 MECHANICAL ASSEMBLY DRAWINGS PARTS LIST SEE PDF ON ATTACHED CD SECTION 6 MECHANICAL ASSEMBLIES ...
Страница 64: ......
Страница 72: ...8 2 V 25APC 5 BARFEED LAYOUT SHEET 1 ...
Страница 73: ...8 3 V 25APC 5 BARFEED LAYOUT SHEET 2 ...
Страница 74: ...8 4 V 25APC 10 BARFEED LAYOUT SHEET 1 ...
Страница 75: ...8 5 V 25APC 10 BARFEED LAYOUT SHEET 2 ...
Страница 76: ...8 6 ...
Страница 78: ......