1.3
LEVELING THE V-25 APC
It is important that the V-25 APC sit solidly on all four leveling bolts, and that the saw table be level. The V-25 APC is
stable in all head positions, and it is not necessary to bolt the saw directly to the floor. The leveling plates provided have
a dimple for the leveling bolt to sit in, and two holes for lagging the plate to the floor. As long as at least two plates are
lagged with two bolts each, the saw will be positively located. The advantage of this approach is that an accidental colli-
sion with the saw may pop the saw out of the dimples, but damage to the saw and the lagging is minimized.
Leveling is checked by applying an accurate bubble level to the saw table, checking level both front-to-rear and side-to-
side. Lock the level using the jam nuts on the leveling bolts.
At least two of the leveling feet should be anchored to the floor.
Leveling Plate
Leveling Bolt
Optional - for direct anchoring
Anchor bolts
Содержание V-25APC
Страница 2: ......
Страница 13: ...0 9 ...
Страница 16: ...0 12 ...
Страница 59: ...4 1 ELECTRICAL SCHEMATICS SEE PDF ON ATTACHED CD SECTION 4 ELECTRICAL ...
Страница 60: ......
Страница 63: ...6 1 MECHANICAL ASSEMBLY DRAWINGS PARTS LIST SEE PDF ON ATTACHED CD SECTION 6 MECHANICAL ASSEMBLIES ...
Страница 64: ......
Страница 72: ...8 2 V 25APC 5 BARFEED LAYOUT SHEET 1 ...
Страница 73: ...8 3 V 25APC 5 BARFEED LAYOUT SHEET 2 ...
Страница 74: ...8 4 V 25APC 10 BARFEED LAYOUT SHEET 1 ...
Страница 75: ...8 5 V 25APC 10 BARFEED LAYOUT SHEET 2 ...
Страница 76: ...8 6 ...
Страница 78: ......