1.7
6.
The cable trough is located by four L-shaped brackets; two hooked into each front and rear conveyor legs. Fasten two
of the brackets to the front end of the cable trough and then place them into the slots at the front conveyor leg. Slide the
other two brackets through the slots of the rear leg and fasten them to the cable trough. Install the two capture bolts to the
brackets on the outside of the rear leg.
7.
The barfeed coolant drain line is tied to the rear leg. Cut and route through the cable trough into the chip tray of the
saw. Be careful to not interfere with the travel of the chip paddle.
Capture bolts for the
bracket are on the back
side of the rear leg.
Coolant drain line
Содержание V-25APC
Страница 2: ......
Страница 13: ...0 9 ...
Страница 16: ...0 12 ...
Страница 59: ...4 1 ELECTRICAL SCHEMATICS SEE PDF ON ATTACHED CD SECTION 4 ELECTRICAL ...
Страница 60: ......
Страница 63: ...6 1 MECHANICAL ASSEMBLY DRAWINGS PARTS LIST SEE PDF ON ATTACHED CD SECTION 6 MECHANICAL ASSEMBLIES ...
Страница 64: ......
Страница 72: ...8 2 V 25APC 5 BARFEED LAYOUT SHEET 1 ...
Страница 73: ...8 3 V 25APC 5 BARFEED LAYOUT SHEET 2 ...
Страница 74: ...8 4 V 25APC 10 BARFEED LAYOUT SHEET 1 ...
Страница 75: ...8 5 V 25APC 10 BARFEED LAYOUT SHEET 2 ...
Страница 76: ...8 6 ...
Страница 78: ......