MI91.2272
25JUN98
GROUNDING INSTRUCTIONS
6,000# KICK-DOWN JACKS
GROUNDING INSTRUCTIONS
1)
GRIND FRAME RAIL CLEAN.
2)
DRILL 1/4" DIAMETER HOLE.
3)
IMPORTANT : PLACE EXTERNAL LOCK WASHERS
ON BOTH SIDES OF TERMINAL AND UNDER NUT.
4)
SEAL BOTH SIDES WITH SILICONE CAULKING.
ACTUATOR
RAP0448
RUBBER BOOT ON TOP
OF PRESSURE SWITCH
PRESSURE SWITCH
RAP8003
TO CONTROL
BOX
PRESSURE SWITCH LEAD
GOES UNDER CABLE
PLACE LOCK WASHERS ON BOTH SIDES
OF WARNING SWITCH TERMINAL
THEN SCREW TO JACK PIVOT AS BEFORE.
ROUTE AND SECURE WIRES TO ALLOW
JACK THE ABILITY TO SWING FORWARD
OR BACKWARD.
WARNING SWITCH
RAP0995
CHASSIS FRAME RAIL
NO SUBSTITUTIONS