
FIELD ENHANCEMENT FOR 610 SYSTEMS
MI91.2246
03FEB20
below should be performed on all 610 Systems as applicable.
1A. GROUND CONTROL BOX
All 610 Systems should have the control box grounded directly to the frame rail. See
Instruction Sheet MI91.2248. If box is not grounded to frame use Box Grounding Kit RAP0999.
(RAP0999 is included in the Motor Grounding Kit RAP0838 below.)
1B. GROUND 3" MOTOR
below should be performed if the system is not properly sensing the switches on the jacks.
2A. KICK-DOWN JACKS-PRESSURE SWITCH, WARNING SWITCH AND GROUNDING
Replace the pressure switch if existing pressure switch does not have a rubber boot on top.
Use RAP8003 Pressure Switch. New style RAP8003 does NOT have a rubber boot.
Replace the warning switch and ground new switch directly to chassis frame rail. Use
RAP0995 Warning Switch. See Instruction Sheet MI91.2272 for 6000# jacks. See Instruction Shee
MI91.2274 for 9000# jacks.
2B. STRAIGHT-ACTING JACKS PRESSURE SWITCH, WARNING SWITCH AND GROUNDING
Replace pressure switch if the existing pressure switch does not have a rubber boot on top.
Use RAP8003 Pressure Switch.
Replace the warning switch and ground the new switch directly to the chassis frame rail. Use
RAP1009 Warning Switch. New style RAP8003 does NOT have a rubber boot.
The pressure switches will have to be grounded with a RAP0770 Ground Kit if the warning
switches are the one wire style.
STEP "1"
STEP "2"
All Fenner Stone power units with 3" diameter motors should have a ground cable on the motor
as shown on Instruction Sheet MI91.2270.
Stone power units with 3" diameter motors were first furnished in mid year 1992. The ground
cable was added in mid year 1993.
The 3" motors were used on some manually controlled leveling systems and on all computeriz-
ed systems except those with the 3.5 gallon square reservoirs. Use Grounding Kit RAP0838.
Obtain the coach VIN number, the owner’s name and address and send them to HWH Corpor-
ation, "ATTENTION: WARRANTY DEPARTMENT", noting that the Pump Motor Ground was added.
2C. PRESSURE SWITCH ADJUSTMENT
New pressure switches may need to be adjusted so that when stabilizing, the jacks will touch
the ground and lift the coach 1/2" to 1". See MI95.44 in this manual.
- Replace the control box and the touch panel at this time if system operation is not operating
correctly. The control box is 3" x 4" x 7" aluminum, generally located under the dash.
- Applies only to 6000# or 9000# kick-down jacks. In certain cases, replacing actuators improve
the leveling or stabilizing function. Consult HWH Corporation before performing this step.
On a 6000# jack, replace the actuator by using an RAP0448 Actuator Kit. On a 9000# jack,
replace the actuator by using an RAP0547 Actuator Kit and an RAP1029 Tube and Fitting Kit.
See Instruction Sheet MI91.2276.
STEP "3"
STEP "4"