G.12
CR 65 2012
4
5
6
7
B
4
1
2
3
5
6
7
ENGINE OVERHAUL
Workshop Manual Ed. 09-2011
Kick start pedal shaft pre-assembly
– Fasten the shaft (
4
) of the kick start pedal with the lower grooved side in the
vice (use protection jaws).
– Insert the starting gear (
5
) with the stopping toothing down on the kick start
pedal shaft.
– Engage the kick start pedal spring (
6
) in the suitable hole of the kick start pedal
shaft and fit the driving hub (
7
) with opening A above the spring end part.
– Remove the kick start pedal shaft from the vice.
Gearbox shafts – component wear check
– Fasten the input and output shafts in the vice (use
protection jaws). Remove the gears and check for wear and seizure signs in
the following points:
– the supporting points of the input and output shafts, and of the neutral
gears;
– the gear front couplings;
– the teeth sides of all gears;
– the toothing profiles of the input and output shafts and of the relevant
gears;
– check the smoothness of the gearbox gear contours.
Thoroughly clean all parts and replace the faulty ones.
Upon each repairing of the gearbox first mount the new circlips.
Содержание CR 65 2012
Страница 1: ...CR 65 2012 Workshop Manual Ed 09 2011 ...
Страница 6: ......
Страница 7: ...b 1 CR 65 2012 b Workshop Manual Ed 09 2011 IMPORTANT NOTICES Section ...
Страница 9: ...A 1 CR 65 2012 A Workshop Manual Ed 09 2011 GENERAL INFORMATION Section ...
Страница 14: ......
Страница 15: ...B 1 CR 65 2012 B Workshop Manual Ed 09 2011 MAINTENANCE Section ...
Страница 19: ...C 1 CR 65 2012 C Workshop Manual Ed 09 2011 TROUBLESHOOTING Section ...
Страница 24: ......
Страница 25: ...D 1 CR 65 2012 D Workshop Manual Ed 09 2011 SETTINGS AND ADJUSTMENTS Section ...
Страница 27: ...D 3 CR 65 2012 Workshop Manual Ed 09 2011 SETTINGS AND ADJUSTMENTS CR 65 ...
Страница 48: ......
Страница 49: ...E 1 CR 65 2012 E GENERAL PROCEDURES Workshop Manual Ed 09 2011 Section ...
Страница 63: ...F 1 CR 65 2012 ENGINE DISASSEMBLY Workshop Manual Ed 09 2011 Section F ...
Страница 73: ...G 1 CR 65 2012 ENGINE OVERHAUL Workshop Manual Ed 09 2011 Section G ...
Страница 86: ......
Страница 87: ...H 1 CR 65 2012 ENGINE REASSEMBLY Workshop Manual Ed 09 2011 Section H ...
Страница 98: ......
Страница 99: ...I 1 CR 65 2012 I FRONT SUSPENSION Workshop Manual Ed 09 2011 Section ...
Страница 105: ...J 1 CR 65 2012 J REAR SUSPENSION Workshop Manual Ed 09 2011 Section ...
Страница 113: ...L 1 CR 65 2012 L BRAKES Workshop Manual Ed 09 2011 Section ...
Страница 122: ......
Страница 123: ...M 1 CR 65 2012 M ELECTRICAL SYSTEM Workshop Manual Ed 09 2011 Section ...
Страница 131: ...N 1 CR 65 2012 N ENGINE COOLING Workshop Manual Ed 09 2011 Section ...
Страница 136: ......
Страница 137: ...P 1 CR 65 2012 Workshop Manual Ed 09 2011 HYDRAULICALLY CONTROLLED CLUTCH Section P ...
Страница 142: ......
Страница 143: ...S 1 CR 65 2012 Workshop Manual Ed 09 2011 FUEL SUPPLY Section S ...
Страница 154: ......
Страница 155: ...W 1 CR 65 2012 W SPECIAL TOOLS Workshop Manual Ed 09 2011 Section ...
Страница 163: ...Y 1 CR 65 2012 Y CHASSIS AND WHEELS Workshop Manual Ed 09 2011 Section ...