INSTALLATION
15
Attach the Handle(s)
Handles are standard for primary moving rails (one for side
stack and two for split stack). Handles are optional for the
secondary rails. If a handle is ordered for the secondary
rail(s), a clear base plate will be installed on each secondary
rail, as well as on the primary moving rail(s).
■
Slide the handle down onto the clear base plate until it
snaps into place.
Secure the Cords with the Cord Anchors
■
Remove the colored tape securing the cords.
IMPORTANT:
The cords must hang freely with no twists. If the cords are twisted, straighten
them out before proceeding.
Side Stack
■
Close the shade within 6" of each end. Adjust the position of the rails as needed when
installing the cord anchors.
■
Attach the end caps on outside mount shades. (End caps on inside mount shades should
already have been installed.)
➤
Loosen the screw on each end cap until it is flush with the top.
➤
Push the end caps into place on the headrail. Hold the cords below the end cap on the
moving rail side when installing it. Be careful not to pinch or twist the cords.
➤
If necessary, tap the end caps in place with a rubber mallet.
➤
Tighten the screw on both end caps.
■
Locate the cord anchor connected to the three cords coming
from the top of the secondary rail.
➤
To secure the cord anchor, first locate the two marks on
the front channel of the headrail near the stacking end.
➤
Hook the cord anchor between the two marks on the front
channel.
➤
Use the provided Allen wrench to tighten the cord anchor
just until snug to secure it to the channel.
IMPORTANT:
The three cords attached to the cord anchor
may need minor tension adjustment. Final cord adjustment
will be explained later in these instructions.
Cord
Anchor
Tighten with
Allen Wrench
Cord Anchor
in Front
Channel
Marks
Front
Channel Cord
Anchor
Bottom View