INSTALLATION
— Inside Mount
11
INSIDE MOUNT PROCEDURES
Mount the Installation Brackets
■
Mark the head jamb 2" from each side jamb.
➤
If more than two installation brackets came with your order, space additional bracket(s)
evenly (or at least every 36") and mark their locations.
➤
Two-piece headrails:
Place a bracket 4" from the center on both sides. Space
additional bracket(s) evenly (or at least every 36") and mark their locations.
■
Center the brackets on your marks and mark the
screw holes.
➤
A minimum depth of 1
1
/
2
" is required to mount
the brackets.
➤
A depth of 4
1
/
2
" is required for fully recessed
mounting with the shade drawn closed, or
5
1
/
2
" with the shade stacked open.
■
Drill the screw holes using a
3
/
32
" drill bit.
CAUTION:
Use drywall anchors when mounting
into drywall.
■
Attach the installation brackets to the mounting
surface using the screws provided.
IMPORTANT:
The front edges of the brackets
must be level with their front edges aligned.
Head Jamb
Jamb
Jamb
2"
2"
Space Evenly
Space Evenly
Jamb
Jamb
Two-Piece Headrails
Split
2"
4"
2"
Space Evenly
Space Evenly
4"
2"