5
Roll-up tarpaulin (optional)
Operating the body
141
Closing / securing the roll-up tarpaulin (CRAMARO)
Pic. 88
Roll-up tarpaulin, released
1
Tarpaulin sections, lateral / rear
2
Pulling rope
Detach the lateral tarpaulin sections.
Fold the tarpaulin sections (Pic. 88 /1)
onto the roll-up tarpaulin, so that they
are secured by the Velcro
connections.
Orderly place the lateral ropes onto
the roll-up tarpaulin.
Detach and secure the rear tarpaulin
sections.
Pic. 89
Tarpaulin, rolled up
1
Tube guide
2
Tube holder
3
Belt
Release the pulling rope (Pic. 88 /2).
Hold the pulling rope firmly during the
roll-up process.
Ensure that the roll-up tarpaulin is
properly rolled up and that the ropes
are rolled in as well.
Pic. 90
Roll-up tarpaulin stored / secured
1
Tube, stored
2
Belt, secured
Check that the tube (Pic. 90 /1) is
stored in the tube holder on both sides
- pull in the tube by hand as required.
Strap down the roll-up tarpaulin using
the belt (Pic. 90 /2).
Check that the roll-up tarpaulin is
safely attached in the storage box and
cannot roll out by chance before
starting the tilting process.
A - 116
2
1
A - 117
2
1
3
A - 118
1
2
Содержание 10000 Series
Страница 1: ...HTK OPERATING INSTRUCTIONS 10000 SERIES EN MACHT S MÖGLICH Three way tipper 195024 xx humbaur com ...
Страница 6: ...Contents 4 ...
Страница 11: ...9 1 Safety ...
Страница 28: ...Personal protective equipment rules prohibitions 26 Safety 1 ...
Страница 29: ...27 2 General information ...
Страница 39: ...37 3 Operation ...
Страница 61: ...59 4 Operating the chassis ...
Страница 102: ...100 Operating the chassis Warning tables optional 4 ...
Страница 103: ...101 5 Operating the body ...
Страница 144: ...5 Roll up tarpaulin optional 142 Operating the body ...
Страница 145: ...143 6 Electrical system ...
Страница 158: ...6 TIM iTAP 156 Electrical system ...
Страница 159: ...157 7 Inspection care and maintenance ...
Страница 218: ...7 Disposal 216 Inspection care and maintenance ...
Страница 219: ...217 8 Troubleshooting ...