3
Connecting element: Towing ring / tubular drawbar
Operation
49
Adjustable tubular drawbar
Pic. 18
Adjusting the tubular drawbar
1
Rear screw connection
2
Tubular drawbar
3
Front screw connection
The tubular drawbar (Pic. 18 /2) is
connected to the chassis with screws
(Pic. 18 /1 and Pic. 18 /3).
The tubular drawbar may only be
adjusted by authorised persons in
a specialised workshop!
The required projecting length of the
tubular drawbar depends on the towing
vehicle and its body / loading bridge.
WARNING
Adjusting the tubular drawbar
The tubular drawbar is heavy. It may fall
down - risk of impact / crushing!
Support the tubular drawbar at least
at two points (front and rear) or secure
these points with hoisting equipment,
e.g. a crane.
The maximum adjustment range in
50 mm steps is 150 mm.
See the Maintenance Section
Page 179 for more information
about assembling the tubular
drawbar.
B - 026
B - 026
1
2
3
Содержание 10000 Series
Страница 1: ...HTK OPERATING INSTRUCTIONS 10000 SERIES EN MACHT S MÖGLICH Three way tipper 195024 xx humbaur com ...
Страница 6: ...Contents 4 ...
Страница 11: ...9 1 Safety ...
Страница 28: ...Personal protective equipment rules prohibitions 26 Safety 1 ...
Страница 29: ...27 2 General information ...
Страница 39: ...37 3 Operation ...
Страница 61: ...59 4 Operating the chassis ...
Страница 102: ...100 Operating the chassis Warning tables optional 4 ...
Страница 103: ...101 5 Operating the body ...
Страница 144: ...5 Roll up tarpaulin optional 142 Operating the body ...
Страница 145: ...143 6 Electrical system ...
Страница 158: ...6 TIM iTAP 156 Electrical system ...
Страница 159: ...157 7 Inspection care and maintenance ...
Страница 218: ...7 Disposal 216 Inspection care and maintenance ...
Страница 219: ...217 8 Troubleshooting ...