8.5 Maintenance on Demand
The tasks below should be performed when instrument indicates the need of
corrective action, or when operation anomalies are encountered.
8.5.1 CUVETTE CHANGE
Before starting every automatic cycle, the instrument will check the cuvette
status. When following circumstances occur the system stops and the cuvettes
have to be changed:
A. When more than 15 cuvettes are out of the absorbance limit (given by the
manufacturer)
B. When the usage value of 25.000 is reached (Maintenance>Operations>Wear)
All cuvettes should be changed at the same time.
To change cuvettes open the
Reaction Tray
Menu.
1. Press
Change
and a following pop up window will be displayed:
“Check the Front- and Back Tray box and press
Ok
.”
2. Remove the red and black covers from the front- and back reaction tray.
3. The reaction tray can be turned with the hand to remove all cuvettes.
4. Place new cuvettes and replace the black and the red cover.
5. When finished press
Ok
.
6. The cuvette water blank will be automatically started, when the tempera-
ture in the reaction try is reached. The number in the counter table (Wear)
will be reset to Zero.
FIGURE 113
Содержание HumaStar 600
Страница 1: ...HumaStar 600 User Manual Cat No 16660 001...
Страница 2: ......
Страница 4: ......
Страница 14: ...HumaStar 600 User manual 10...
Страница 44: ...HumaStar 600 User manual 40...
Страница 107: ...ISE Module Cat no 16663 03 103 7 ISE MODULE CAT NO 16663 03 See HumaStar 600 ISE MODULE User Manual 16663 1...
Страница 108: ...HumaStar 600 User manual 104...
Страница 129: ...125...
Страница 130: ...HumaStar 600 User manual 126...
Страница 131: ......