UPS5000-E-(50 kVA-300 kVA)
User Manual (50 kVA Power Modules)
3 Installation
Issue 02 (2017-02-25)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
53
Figure 3-4
Removing binding tapes
Step 4
Remove packing materials, as shown in
Figure 3-5
Removing packing materials
Step 5
Remove the plastic bag and take out the fittings box.
Step 6
Check that the UPS is intact.
1.
Visually inspect the UPS appearance for shipping damage. If it is damaged, notify the
carrier immediately.