UPS5000-E-(50 kVA-300 kVA)
User Manual (50 kVA Power Modules)
3 Installation
Issue 02 (2017-02-25)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
66
3.2.3.4 Connecting the BCB box
Open the cover on the BCB box, and connect the BCB ports on the dry contact card to the
control signal ports on the BCB box. For details, see the
PDC-(0250, 0400, 0630)
DC0384BXA BCB Box User Manual
or
PDU8000-(0125, 0250, 0400, 0630, 0800)
DCV8-BXA001 BCB Box User Manual
.
3.2.3.5 Connecting the BBB box
Connect the BBB box. For details, see the
PDU8000-(0630, 1250, 2000) DCV8-BGA001 BBB
Box User Manual
.
3.2.3.6 Installing a Battery Grounding Failure Detector
Procedure
Step 1
Install a battery grounding failure detector. For the installation method, see
UPS5000 Battery
Grounding Failure Detector User Manual
.
shows the position for a battery grounding failure detector in a
UPS5000–E-200K-SM.
shows the position for a battery grounding failure detector in a
UPS5000–E-200K-FM.
shows the position for a battery grounding failure detector in a
UPS5000–E-300K-SM.
shows the position for a battery grounding failure detector in a
UPS5000–E-300K-SMT.
Figure 3-23
Position of a battery grounding failure detector in a UPS5000–E-200K-SM
(1) Battery grounding failure detector