UPS5000-E-(50 kVA-300 kVA)
User Manual (50 kVA Power Modules)
3 Installation
Issue 02 (2017-02-25)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
79
Route cables for the UPS from inside out and from bottom up.
After routing cables, use firestop putty to fill in the gap between the cables and the cabinet.
Procedure
Step 1
Open the front door and remove the cover from the power distribution subrack, as shown in
shows the positions of copper bars.
Step 2
Determine the cabling mode.
Remove small covers for routing cables.
Remove the cable cover for signal cables, and remove small covers from the bottom
based on site requirements, as shown in
Figure 3-38
Removing small covers from the bottom of the cabinet
Drill holes into the large cover for routing cables.
a.
Remove all the cable cover for signal cables and small covers from the bottom.
b.
Remove the two large covers from the bottom rear of the cabinet, drill holes into
them, and install them to the positions where the small covers were originally, as
shown in