SmartACU2000B smart array controller
User Manual (with PID modules, 800 V AC)
5 Electrical Connections
Issue 05 (2019-01-20)
Copyright © Huawei Technologies Co., Ltd.
80
Figure 5-30
Stripped cable length
Step 2
Connect the cable to the single-phase input switch.
Connect the L and N (L) cables to the L and N (L) terminals of the station-service power
source for the box-type transformer through an MCB.
Step 3
Bind the cable.
Figure 5-31
Connecting a cable
----End
5.16 Connecting the DO/AO/DI/AI Signal Cable
The smart array controller reserves the PID01_DO, PID02_DO, DO, AO, DI, and AI
waterproof connectors for appropriate signal cables.
For details about how to prepare and connect the cables, see the
SmartPID2000 User Manual
and
SmartLogger2000 User Manual
.