SmartACU2000B smart array controller
User Manual (with PID modules, 800 V AC)
5 Electrical Connections
Issue 05 (2019-01-20)
Copyright © Huawei Technologies Co., Ltd.
60
Figure 5-8
ATB interior
(1) Fiber spool (2) Fixing points for internal steel wires of optical cables
(3) Cable clip
Procedure
Step 1
Remove the ATB cover.