SmartACU2000B smart array controller
User Manual (with PID modules, 800 V AC)
7 System Maintenance
Issue 05 (2019-01-20)
Copyright © Huawei Technologies Co., Ltd.
95
Figure 7-8
Removing a tray
Step 3
Remove mounting ears from the new SmartLogger2000.
Figure 7-9
Removing mounting ears
Step 4
Install the tray on the new SmartLogger2000.
Step 5
Install the new SmartLogger2000.
Step 6
Connect the cables to the new SmartLogger2000 based on the cable labels.
----End