18
Unpack the shipping carton
3.
Use a boxcutter to cut the sealing tape. Be careful that you do not cut into the carton. Retain the carton
and packaging in case you need to return the system.
4.
Remove the rail kit (callout 1), which contains the rails and the installation instructions.
Figure 4: OmniCube Shipping Carton Contents
5.
Remove the cable management arm (CMA) kit, (callout 2) which contains the CMA assembly, a
signal LED extension cable, and the installation instructions. Do not open this box until the end of the
installation procedure, when you are ready to organize the system cables.
6.
Remove the accessory pack (callout 3), which contains:
• SimpliVity bezel.
• Power and network cables.
• Software and documentation flash drive.
•
Quick Start
posters and international
Product Information Guide
.
7.
If you are not ready to install the system in a rack, keep it in the shipping box or place it on a sturdy
surface that is protected from electrostatic discharge.
Shipping carton contents
The shipping carton contains standard items and other items based on your configuration.