Installation 46
3.
Connect the CAN bus communication cable from the DB-15 connector on the UPS to the DB-15
connector on the battery pack.
4.
Switch the circuit breaker on the battery pack right to the On position.
To install a second battery pack that is the same battery type and rack U height:
1.
Verify that the circuit breaker on the battery pack is in the left, Off position.
2.
Connect the DC to DC power cable from the first battery pack connector to the second battery pack
connector.
Up to two packs can be connected to the UPS.
3.
Connect the CAN bus communication cable from the first battery pack to the second battery pack.
Содержание R12000 XR
Страница 17: ...Overview 17 o Two 3U DirectFlow Battery Packs o Two 1U DirectFlow Battery Packs ...
Страница 98: ...Troubleshooting 98 ...
Страница 99: ...Troubleshooting 99 ...
Страница 100: ...Troubleshooting 100 ...
Страница 101: ...Troubleshooting 101 ...
Страница 102: ...Troubleshooting 102 ...
Страница 103: ...Troubleshooting 103 ...
Страница 104: ...Troubleshooting 104 ...
Страница 105: ...Troubleshooting 105 ...
Страница 106: ...Troubleshooting 106 ...
Страница 107: ...Troubleshooting 107 ...
Страница 108: ...Troubleshooting 108 ...
Страница 109: ...Troubleshooting 109 ...
Страница 110: ...Troubleshooting 110 ...
Страница 111: ...Troubleshooting 111 ...