![HP R12000 XR Скачать руководство пользователя страница 29](http://html.mh-extra.com/html/hp/r12000-xr/r12000-xr_user-manual_166295029.webp)
Installation 29
o
For rack shipping or relocation, install the shipping brackets at the rear of each rail.
5.
Tighten the wing nuts or hex nuts.
Installing rack rails for the 3U battery pack
WARNING:
To reduce the risk of personal injury or damage to the equipment, be sure that:
•
The leveling feet are extended to the floor.
•
The full weight of the rack rests on the leveling feet.
•
The stabilizing feet are attached to the rack if it is a single-rack installation.
•
The racks are coupled together in multiple-rack installations.
•
Only one component is extended at a time. A rack may become unstable if more than one
component is extended for any reason.
IMPORTANT:
Mounting hardware for square- and round-holed racks is included in the battery
pack kit.
To install the mounting rails for the 3U DirectFlow Battery Pack:
1.
Loosen the wing nuts or hex nuts, and then extend the brackets to the desired length.
Содержание R12000 XR
Страница 17: ...Overview 17 o Two 3U DirectFlow Battery Packs o Two 1U DirectFlow Battery Packs ...
Страница 98: ...Troubleshooting 98 ...
Страница 99: ...Troubleshooting 99 ...
Страница 100: ...Troubleshooting 100 ...
Страница 101: ...Troubleshooting 101 ...
Страница 102: ...Troubleshooting 102 ...
Страница 103: ...Troubleshooting 103 ...
Страница 104: ...Troubleshooting 104 ...
Страница 105: ...Troubleshooting 105 ...
Страница 106: ...Troubleshooting 106 ...
Страница 107: ...Troubleshooting 107 ...
Страница 108: ...Troubleshooting 108 ...
Страница 109: ...Troubleshooting 109 ...
Страница 110: ...Troubleshooting 110 ...
Страница 111: ...Troubleshooting 111 ...