Hardware options installation 50
9.
Install the expansion board.
10.
Connect any required internal or external cables to the expansion board. See the documentation that
ships with the expansion board.
11.
If installing a full-length expansion board, install back the board retainer.
12.
Install the air baffle (on page
22
).
13.
Install the access panel (on page
21
).
14.
Lock the tower bezel.
15.
Connect each power cord to the server.
16.
Connect each power cord to the power source.
17.
Power up the server (on page
19
).
Dedicated iLO management port option
NOTE:
Depending on model purchased, the server may look slightly different than shown.
To install the component:
1.
Power down the server (on page
19
).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Unlock the tower bezel ("
Unlock and open the tower bezel
" on page
20
).
4.
Remove the access panel (on page
21
).
Содержание ProLiant ML110 G7
Страница 6: ...Contents 6 ...
Страница 13: ...Component identification 13 SAS and SATA drive numbering Four bay LFF drive model Eight bay SFF drive model ...
Страница 86: ...Troubleshooting 86 ...
Страница 105: ...Support and other resources 105 ...
Страница 106: ...Support and other resources 106 ...