Hardware options installation 44
7.
Install the optical drive into the lower optical drive bay. When fully inserted, the assembly locking latch
clicks.
8.
Connect the drive cables:
a.
Connect the power cable to the drive.
b.
Connect one end of the SATA cable to the drive and the other end to the system board.
For cable routing information, see "Optical drive cabling (on page
63
)."
9.
Install the access panel (on page
21
).
10.
Lock the tower bezel.
11.
Connect each power cord to the server.
12.
Connect each power cord to the power source.
13.
Power up the server (on page
19
).
Содержание ProLiant ML110 G7
Страница 6: ...Contents 6 ...
Страница 13: ...Component identification 13 SAS and SATA drive numbering Four bay LFF drive model Eight bay SFF drive model ...
Страница 86: ...Troubleshooting 86 ...
Страница 105: ...Support and other resources 105 ...
Страница 106: ...Support and other resources 106 ...