Hardware options installation 42
14.
Install the battery/capacitor pack.
15.
Install the full-length expansion board retainer, if any full-length expansion boards were removed.
16.
Install the air baffle (on page
22
).
17.
Install the access panel (on page
21
).
18.
Lock the tower bezel.
19.
Connect each power cord to the server.
20.
Connect each power cord to the power source.
21.
Power up the server (on page
19
).
Optical drive option
To install the component:
1.
Power down the server (on page
19
).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Unlock the tower bezel ("
Unlock and open the tower bezel
" on page
20
).
4.
Remove the access panel (on page
21
).
Содержание ProLiant ML110 G7
Страница 6: ...Contents 6 ...
Страница 13: ...Component identification 13 SAS and SATA drive numbering Four bay LFF drive model Eight bay SFF drive model ...
Страница 86: ...Troubleshooting 86 ...
Страница 105: ...Support and other resources 105 ...
Страница 106: ...Support and other resources 106 ...