Hardware options installation 35
10.
Slide the drive cage assembly fully into the server chassis and install the four screws.
11.
Install the drives ("
Installing a drive
" on page
30
).
CAUTION:
To prevent improper cooling and thermal damage, do not operate the server unless
all bays are populated with either a component or a blank.
12.
Install the access panel (on page
21
).
13.
Lock the tower bezel.
14.
Connect each power cord to the server.
15.
Connect each power cord to the power source.
16.
Power up the server (on page
19
).
Eight-bay SFF hot-plug drive cage option
To install the component:
1.
Power down the server (on page
19
).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Unlock the tower bezel ("
Unlock and open the tower bezel
" on page
20
).
4.
Remove the access panel (on page
21
).
5.
Remove all installed drives.
6.
Disconnect the drive cage cables.
Содержание ProLiant ML110 G7
Страница 6: ...Contents 6 ...
Страница 13: ...Component identification 13 SAS and SATA drive numbering Four bay LFF drive model Eight bay SFF drive model ...
Страница 86: ...Troubleshooting 86 ...
Страница 105: ...Support and other resources 105 ...
Страница 106: ...Support and other resources 106 ...