Operations 23
1.
Insert the tabs on the baffle into the slots on the rear chassis.
2.
Push the front end of the baffle inside the chassis.
3.
Install the access panel (on page
21
).
4.
Lock the tower bezel.
5.
Connect each power cord to the server.
6.
Connect each power cord to the power source.
7.
Power up the server (on page
19
).
Содержание ProLiant ML110 G7
Страница 6: ...Contents 6 ...
Страница 13: ...Component identification 13 SAS and SATA drive numbering Four bay LFF drive model Eight bay SFF drive model ...
Страница 86: ...Troubleshooting 86 ...
Страница 105: ...Support and other resources 105 ...
Страница 106: ...Support and other resources 106 ...