Tie-Down kit 120
3.
Insert and partially tighten four bolts with washers, securing the front tie-down to the front caster plate.
4.
Align the rear tie-down with the holes on the rear caster plate (1).
5.
Insert the four spring clips (2), and then partially tighten four bolts with washers (3), securing the rear
tie-down to the rear caster plate.
6.
Tighten the bolts from step 3.
7.
Tighten the bolts from step 5.
8.
Secure the rack to the floor ("
Securing the rack to the floor
" on page
121
).
Installation is complete.
Содержание HP 10000 G2 Series
Страница 35: ...Cable Management Bracket kit 35 Installation is complete ...
Страница 41: ...Cable Management Tray kit 41 4 Route the cables through the cable management tray Ground bonding stud location ...
Страница 74: ...Hook and Loop Cabling Strap Clip kit 74 ...
Страница 75: ...Hook and Loop Cabling Strap Clip kit 75 Installation is complete ...
Страница 104: ...Rack Air Duct kit 104 For more information see Baying kit on page 25 ...
Страница 125: ...Vertical PDU Mounting kit 125 HP monitored PDU 2 Install the PDU The installation is complete ...