100 Kilo Sliding Shelf kit 16
7.
Secure the opposite end of the cable management arm to the rack using two M6 x 12 pan HD screws
and M6 external washers.
Installation is complete.
Using the 100 Kilo Sliding Shelf
Use the handle on the front of the sliding shelf to slide it in and out of the rack. When sliding the shelf back
into the rack, there may be resistance. Apply pressure as needed to fully move the shelf into the rack.
IMPORTANT:
Be sure to secure all rack mount system components when moving the shelf out of
the rack.
Содержание HP 10000 G2 Series
Страница 35: ...Cable Management Bracket kit 35 Installation is complete ...
Страница 41: ...Cable Management Tray kit 41 4 Route the cables through the cable management tray Ground bonding stud location ...
Страница 74: ...Hook and Loop Cabling Strap Clip kit 74 ...
Страница 75: ...Hook and Loop Cabling Strap Clip kit 75 Installation is complete ...
Страница 104: ...Rack Air Duct kit 104 For more information see Baying kit on page 25 ...
Страница 125: ...Vertical PDU Mounting kit 125 HP monitored PDU 2 Install the PDU The installation is complete ...