Ground Bonding kit 60
3.
Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the extension
kit and tighten.
4.
Repeat the previous steps for the opposite side of the rack.
From the extension kit to the top rack side panel:
1.
Insert a T-25 Torx screw through the end of the 36.83-cm (14.5 in) grounding strap, and secure it to the
top side panel.
2.
Place the other end of the same grounding strap over the grounding lug on the extension kit.
Содержание HP 10000 G2 Series
Страница 35: ...Cable Management Bracket kit 35 Installation is complete ...
Страница 41: ...Cable Management Tray kit 41 4 Route the cables through the cable management tray Ground bonding stud location ...
Страница 74: ...Hook and Loop Cabling Strap Clip kit 74 ...
Страница 75: ...Hook and Loop Cabling Strap Clip kit 75 Installation is complete ...
Страница 104: ...Rack Air Duct kit 104 For more information see Baying kit on page 25 ...
Страница 125: ...Vertical PDU Mounting kit 125 HP monitored PDU 2 Install the PDU The installation is complete ...