Fan (110V/220V) kit 44
5.
Insert the notched end of the tie wrap into a small hole in the rack rail and push the tie wrap in to lock
it in place. Encircle the power cord with the tie wrap by inserting the free end of the tie wrap into the
hole on the other end of the tie wrap, pulling the tie wrap tight, and cutting off excess length.
Installation is complete.
Содержание HP 10000 G2 Series
Страница 35: ...Cable Management Bracket kit 35 Installation is complete ...
Страница 41: ...Cable Management Tray kit 41 4 Route the cables through the cable management tray Ground bonding stud location ...
Страница 74: ...Hook and Loop Cabling Strap Clip kit 74 ...
Страница 75: ...Hook and Loop Cabling Strap Clip kit 75 Installation is complete ...
Страница 104: ...Rack Air Duct kit 104 For more information see Baying kit on page 25 ...
Страница 125: ...Vertical PDU Mounting kit 125 HP monitored PDU 2 Install the PDU The installation is complete ...