Cable Management Bracket kit 31
1.
Place a cable management D-ring bracket clip (1) on a cable management D-ring bracket clamp (2).
2.
Install the cable management D-ring bracket in a front mount ("
Front mount
" on page
31
).
3.
Install the cable management D-ring bracket in a side mount ("
Side mount
" on page
32
).
Front mount
1.
Using a cage nut insertion tool, install an M6 cage nut into the desired location on the front of your rack.
2.
Align the cable management D-ring bracket with the previously installed M6 cage nut (1).
Содержание HP 10000 G2 Series
Страница 35: ...Cable Management Bracket kit 35 Installation is complete ...
Страница 41: ...Cable Management Tray kit 41 4 Route the cables through the cable management tray Ground bonding stud location ...
Страница 74: ...Hook and Loop Cabling Strap Clip kit 74 ...
Страница 75: ...Hook and Loop Cabling Strap Clip kit 75 Installation is complete ...
Страница 104: ...Rack Air Duct kit 104 For more information see Baying kit on page 25 ...
Страница 125: ...Vertical PDU Mounting kit 125 HP monitored PDU 2 Install the PDU The installation is complete ...