Tie-Down kit 123
Securing the 1200 mm full frame rack to the floor
The following illustration indicates where to drill the holes to secure the 1200 mm full frame rack to the floor.
The distances are measured from the holes on the tie-downs. Have your building structural engineer drill the
holes. Then secure the rack to the floor by inserting a bolt with a washer into each hole.
Содержание HP 10000 G2 Series
Страница 35: ...Cable Management Bracket kit 35 Installation is complete ...
Страница 41: ...Cable Management Tray kit 41 4 Route the cables through the cable management tray Ground bonding stud location ...
Страница 74: ...Hook and Loop Cabling Strap Clip kit 74 ...
Страница 75: ...Hook and Loop Cabling Strap Clip kit 75 Installation is complete ...
Страница 104: ...Rack Air Duct kit 104 For more information see Baying kit on page 25 ...
Страница 125: ...Vertical PDU Mounting kit 125 HP monitored PDU 2 Install the PDU The installation is complete ...