
4.
Install the drive:
• SFF SmartDrive
• Low-profile LFF hot-plug drive
5.
Determine the status of the drive from the
.
6.
For information on drive bay mapping in the HPE Apollo r2800 Chassis and the factory default configuration,
see "
Drive bay mapping for the HPE Apollo r2800 Chassis
To configure arrays, see the
HPE Smart Storage Administrator User Guide
on the
.
Installing the node blank
About this task
For more information about product features, specifications, options, configurations, and compatibility, see the
product QuickSpecs on the
Hewlett Packard Enterprise website
CAUTION:
To ensure proper thermal cooling, the four server tray slots must be populated with server nodes or
node blanks.
Installing the node blank
77
Содержание Apollo 2000 System
Страница 50: ... 1U left rear I O blank 2U rear I O blank 50 Operations ...
Страница 123: ... AMD FirePro S9150 GPU NVIDIA Quadro K4200 GPU or NVIDIA Quadro M4000 GPU Hardware options installation 123 ...
Страница 130: ... AMD FirePro S9150 GPU 11 Install Accelerator 1 into slot 3 AMD FirePro S7150 GPU 130 Hardware options installation ...
Страница 134: ...AMD FirePro S9150 19 Install Accelerator 2 into slot 4 AMD FirePro S7150 GPU 134 Hardware options installation ...