Director blade filler panel
This section describes how to remove and replace a Director blade filler panel (see
Figure 29
).
Removing a filler panel
CAUTION:
A filler panel should be removed only when being replaced with a Director blade, or new
filler panel. Any slot that is not occupied by a Director blade should be occupied by a filler panel to ensure
correct cooling of the chassis and protection from dust.
To remove a filler panel:
1.
Remove the chassis door. See ”
Removing the chassis door
” on page 64.
2.
Unscrew the thumb screw at the bottom of the panel using the Phillips screwdriver.
3.
Pull the filler panel out of the chassis (see
Figure 29
).
Replacing a filler panel
To replace a filler panel:
1.
Orient the filler panel (see
Figure 29
).
2.
Slide the filler panel into the slot until it is firmly seated.
3.
Tighten the thumb screw at the bottom of the panel.
4.
Replace the chassis door (see See ”
Removing the chassis door
” on page 64).
Figure 29
Director blade filler panel
26395a
Содержание A7990A - StorageWorks SAN Director 4/16 Blade Switch
Страница 8: ...8 ...
Страница 27: ...DC SAN Backbone Director hardware reference guide 27 I Figure 3 14U Rack Mount Kit contents 26419a ...
Страница 62: ...62 Monitor system components ...
Страница 100: ...100 Installing Field replaceable units FRUs ...
Страница 122: ...122 Intelligent blades ...
Страница 132: ...132 Regulatory compliance and safety notices ...
Страница 134: ...134 Port numbering templates 26390a ...
Страница 135: ...DC SAN Backbone Director hardware reference guide 135 26389a ...
Страница 136: ...136 Port numbering templates 26388a ...
Страница 137: ...DC SAN Backbone Director hardware reference guide 137 FC 10 6 0 2 3 4 5 1 2 3 4 5 FC 10 6 2 3 4 5 1 1 0 0 26391a ...
Страница 140: ...140 Port numbering templates ...