Fitting the pellet hopper BioL

yt

 (100-160)

Attachment set 

A, F (Fig. 29)

19.

  Mount the attachment bracket (20, in 

the casing 

package) 

for the pellet 

hopper: 

the angular 

rails 

are screwed 

onto the boiler 

with nuts M8 plus 

U-washers 

from 

below 

on BioL

yt (130-160) 

and from above on BioL

yt (100) respectively 

(A). 

The brackets can be screwed 

on on the right or left. Slide the pellet hopper 

into 

position 

before 

the 

final 

tightening 

of the 

nuts, and 

align 

it with 

the 

connection 

tube 

(22) 

on 

the 

burner 

mechanism. 

Align 

the 

attachment 

bracket 

on 

the 

rear 

to 

dimension 790 mm (on BioL

yt (130-160)) or dimension 832 mm (on BioL

yt (100)) respectively

.

20.

  Slide the pellet hopper (21) into the attachment brackets, screw it to the brackets with M8x20 (F) (BioL

yt (130-160)) or M8x70 (BioL

yt (100)).

21.

  Connect the connection tube (22) to the metering tube using a self-locking clip. Do not forget the gasket!

22.

  Fit induced-draught fan (24) (4 pcs. - nut M8 with washer and circlip).

23.

 

 Screw 

clampin

plate 

with 

automatic 

firing 

device 

(25) 

on 

the 

side 

of 

the 

pellet 

hopper 

(21) 

(unscrew 

the 

self-trapping 

screws, 

hook 

in 

the 

clamping 

plate, 

re

-

tighten the screws).

NOTICE

• 

The 

automatic 

firing 

device 

must 

be 

mounted 

on 

the 

burner 

swivel 

side. 

To 

change 

the 

combustion 

chamber 

door 

attachment 

side, 

see 

chapter 

4.1 for BioL

yt (100-160).

• 

Do not remove any unnecessary self-trapping screws in the pellet hopper

.

They are used for sealing (keyword: suction turbine negative pressure).

24.

  Fit the metering 

screw (26, top screw) inside 

the metering 

tube (pellet 

hopper) 

and 

secure 

with hex socket screws 

M8x60 

(with circlips, 

screws and 

spacers 

supplied with the metering screw). Do not forget the gasket.

25.

 

 Cab

le ducts (27) must be fitted on the same side as the automatic firing device (25) ((A) 4 pcs. - nut M6 with washer).

26.

 

Mounting 

the 

pellet 

suction 

turbine 

(23, 

option). 

Mount 

the 

edge 

protection 

profile 

(23b) 

in 

the 

pellet 

hopper 

at 

position 

(23a). 

Place 

the 

suction 

system 

(23) 

on 

the four M6 threaded 

bolts. Place 

a plastic 

insulating 

sleeve 

(23c) (collar 

downward) 

and 

a tall washer 

(23d) 

on each bolt and 

then secure the suction system 

with wing nuts (23e). Route the extension cable of the suction system to the rear along 

the centre of the hopper 

and between 

hopper and boiler downward 

to the 

automatic 

firing 

device. 

Establish 

connection 

in 

accordance 

with 

the 

wiring 

diagram. 

When 

routing 

the 

cable 

ensure 

that 

it 

cannot 

touch 

the 

heating 

surface 

cleaner mechanism (HFR, Fig. 31, page 29). 

The sound attenuation cowl is placed later during the installation of the casing (43, Fig. 35, page 31).

Figure shows BioL

yt (130-160)

*on BioL

yt (100)

Dimension 832 mm

26

4 214 852 / 01

ASSEMBLy BIOLyT (100-160)

Содержание BioLyt 100

Страница 1: ...qualified experts These instructions are intended exclusively for the spe cialist Electrical installations may only be carried out by a qualified electrician BioLyt 50 160 Wood pellet boiler These ins...

Страница 2: ...BioLyt 50 75 16 3 9 Fitting the casing BioLyt 50 75 18 3 10 Fitting the ash box and miscellaneous BioLyt 50 75 20 4 Assembly BioLyt 100 160 4 1 Changing the door attachment side BioLyt 100 160 22 4 2...

Страница 3: ...formation 45 6 3 2 Terminal plate with automatic firing device 46 7 Commissioning 7 1 Water quality 47 7 2 Filling up the heating system the calorifier if fitted and hot water buffer storage tank 48 7...

Страница 4: ...ING and DANGER General warning of a danger zone Warning dangerous electrical voltage as a warning for accident prevention Ensures that people do not come into contact with electrical voltage The dange...

Страница 5: ...and process water DIN 1988 Part 2 Technical rules for drinking water in stallations DVGW VDI 2035 Guidelines for the prevention of cor rosion and scale formation in water heating systems DIN V 18160...

Страница 6: ...in smoke control areas in England In Scotland and Wales this power rests with Ministers in the devolved administrations for those countries Separate legislation the Clean Air Northern Ireland Order 19...

Страница 7: ...7 4 214 852 01 NOTES...

Страница 8: ...g and insulation Ash box Installation For overall unit dimensions see page 40 The ash discharge motor rear side of the boiler should be disassembled if there is a risk of damaging it during installati...

Страница 9: ...hanism 4 4 4 Washer A D 10 5 20x2 Circlips B10 Hex nuts M10 C 6024028 Attachment set C Installation protecting plate 4 8 8 2 4 Self tapping screw with recessed head ST4 8x16 C H Washer D 5 3 15x1 2 Se...

Страница 10: ...2 for the swivel arm top and bot tom 6 Swivel the arm 3 to the other side 7 Refit screws 2 for the swivel arm top and bottom 1 2 3 Fig 02 Figure delivery state Boiler door swivel mounted to the right...

Страница 11: ...sioned by Hoval Service 3 4 Water side and flue gas side connecti on BioLyt 50 75 The boiler can be connected up before fitting the casing A return temperature control system is required see hydraulic...

Страница 12: ...on mat 3 around the base of the water jacket black sides outwards and secure with tension springs 3a 11 Place the insulation mat 4 around the top of the water jacket black sides outwards and starting...

Страница 13: ...5 Attachment set B 12 Close the combustion chamber door tighten the palm grips 13 Install burner mechanism 7 Do not forget the gasket 14 Insert the fan heater 8 into the ignition tube Fig 12 8 7 B 13...

Страница 14: ...crews hook in the clamping plate retighten the screws The automatic firing device must be mounted on the burner swivel side To change the combustion chamber door attachment side see chapter 3 1 for Bi...

Страница 15: ...Fig 14 Fig 13 A 24a 25 28a 28 20 24 F 26 21 27 22 20 23 23a 2 3b 23e 23d 23c A 25 15 4 214 852 01 Assembly BioLyt 50 75...

Страница 16: ...stalled into this immersion sleeve when proceeding with the installation of the casing Mount the return temperature sensor BRU on the return line Install the lambda probe see Fig 15 Insert the cable f...

Страница 17: ...AAT Fig 16 Fig 17 PBSu AGF WF STB HFR SZG ESF BRF DG DG PWM 17 4 214 852 01 Assembly BioLyt 50 75...

Страница 18: ...n plates and attach to the pellet hopper serrated washer washer must be used for the earth connection Attach speed nuts C clips 33b C 27 Mount the top sections of the rear wall 34 34a using self tappi...

Страница 19: ...Fig 20 30 32 31 34a 34 35 36 36a 37 38 41 33 39a 40a 39 33 42 X X X X 40 33a X 41a NOTICE Note Insert cover 38 before mounting the suction hoses 19 4 214 852 01 Assembly BioLyt 50 75...

Страница 20: ...s as otherwise the connection to the boiler will not be airtight Ash box should be raised slightly at the wheels a few mm it will then be pressed optimally against the gasket 50a when the threaded rod...

Страница 21: ...21 4 214 852 01 NOTES...

Страница 22: ...lue gas side connecti on BioLyt 100 160 The boiler can be connected up before fitting the casing A return temperature control system is required see hydraulic schematics for the individual system A te...

Страница 23: ...jacket at the bottom and secure with tension springs 3a Observe the correct alignment The water jacket is not symmetrical 9 Place insulation mat 4 around the top of the water jacket black side outwar...

Страница 24: ...g sleeve 11 and position it horizontal and towards the right Screw in the primary air pipe 11b NOTICE The air pipe does not have to be sealed Do not use hemp or Teflon tape 12 Screw on the pressure fa...

Страница 25: ...L ftungs und Klimaanlagen Luftklappengr sse bis ca 3 m 2 Stellkraft 450 N Nennspannung AC DC 24 V Ansteuerung Auf Zu oder 3 Punkt Hubh he bis max 100 200 oder 300 mm einstellbar in 20 mm Schritten Typ...

Страница 26: ...ner swivel side To change the combustion chamber door attachment side see chapter 4 1 for BioLyt 100 160 Do not remove any unnecessary self trapping screws in the pellet hopper They are used for seali...

Страница 27: ...Figure shows BioLyt 130 160 o n B i o L y t 1 0 0 D i m e n s i o n 8 3 2 m m Fig 29 F A 22 26 21 27 20 23 20 25 24 23a 23b 23e 23d 23c 7 9 0 27 4 214 852 01 Assembly BioLyt 100 160...

Страница 28: ...stallation of the casing Mount the return temperature sensor BRU on the return line Install the lambda probe see Fig 30 for BioLyt 130 160 The BioLyt 100 has a pre installed plastic coupling for this...

Страница 29: ...Fig 31 Fig 32 SZG HFR WF STB AGF AAT PBSu ESF BRF DG DG PWM Figure shows BioLyt 130 160 Figure shows BioLyt 130 160 29 4 214 852 01 Assembly BioLyt 100 160...

Страница 30: ...otection plates and attach to the pellet hopper serrated washer washer must be used for the earth connection Attach speed nuts C clips 34c C 32 Mount the top sections of the rear wall 35 35a using sel...

Страница 31: ...Insert cover 39 before mounting the suction hoses Fig 35 41 4 1b 34 38 38a 39 35 35a 36 36a 37 37a 33 32 31 40 34 30 30a 3 0b 42a 42 X X X X X X W W 40a 3 4b X 41a 34a 43 Figure shows BioLyt 130 160 3...

Страница 32: ...orts 50b as otherwise the connection to the boiler will not be airtight Ash box should be raised slightly at the wheels a few mm it will then be pressed optimally against the gaskets 50a when the thre...

Страница 33: ...ed The connection can be made with RC elements for example Measures must be taken in the building and on electri cal equipment to protect the units against overvoltage caused by lightning strikes The...

Страница 34: ...C elements for example Measures must be taken in the building and on electri cal equipment to protect the units against overvoltage caused by lightning strikes The mains connection for the heating sys...

Страница 35: ...draught fan in the front section where it burns cleanly and completely with low emission levels The horizontal combustion results in a flame similar to that of an oil or a gas fan burner Figure BioLyt...

Страница 36: ...r content litres 180 215 245 360 360 Pellet hopper content kg 130 130 105 130 130 Ash area capacity litres 65 65 120 180 180 Thickness of insulation of boiler body mm 80 80 80 80 80 Boiler weight with...

Страница 37: ...nnection return air hose pipe bend rotatable 360 50 mm 10 Feed unit RAS 85 with sound absorbing hood accessories 11 Viewing glass 12 Sleeve for boiler sensor Rp 13a Sleeve for sensor of thermal flow s...

Страница 38: ...tor 8 Connection conveyor hose pipe bend rotatable 360 50 mm 9 Connection return air hose pipe bend rotatable 360 50 mm 10 Feed unit RAS 85 with sound ab sorbing hood accessories 11 Viewing glass 12 S...

Страница 39: ...n for conveyor hose Pipe elbow 360 rotating 50 mm 9 Connection for return air hose Pipe elbow 360 rotating 50 mm 10 Feed unit RAS 85 with sound attenuation cowl accessory 11 Sight glass 12 Sleeve for...

Страница 40: ...et box extension or sound insulation underlay correspondingly taller Space requirements BioLyt 130 160 This area must remain free for maintenance work This area must remain free for maintenance work T...

Страница 41: ...mm Fig BioLyt 130 160 also applies to BioLyt 100 The automatic ash removal can be fitted on both sides i e optionally on the left or right side of the boiler In addition the ash container can be place...

Страница 42: ...oom The pipelines must not be in the way here Buffer storage tank The installation of an energy storage is generally recom mended For over dimensioned boilers 20 or in tho se cases where parts of the...

Страница 43: ...TopTronic E buffer module VF1 Flow temperature sensor 1 B1 1 Flow temperature guard if required MK1 Pump mixer circuit 1 YK1 Actuator mixer 1 UPA Actuator start load relief single wire control AF Outd...

Страница 44: ...ed within the boiler room NOTICE The diameter of the flue gas pipe connecting the boiler to the flue gas system must not be smaller than that of the flue gas outlet on the boiler Connect the flue gas...

Страница 45: ...r cables are routed separately The cable duct is divided into 2 sections for this pur pose Z Cable infeeds heating controller WEZ etc Mixer circuit outdoor sensor etc Ensure that the 230 V power cable...

Страница 46: ...he cables do not touch any hot or sharp edged components and that they are not damaged in any way Fig 40 Fig 41 NOTICE The cables that lead from the burner mecha nism to the clamping plate must be bun...

Страница 47: ...eeks of heating operation Filling and replacement water For a plant using Hoval boilers untreated drinking water is generally best suited as heating medium i e as fill ing and replacement water Howeve...

Страница 48: ...Information for the installer Obtain from the user written confirmation that the operation and maintenance proce dures have been explained to him and that he has received the corresponding operating m...

Страница 49: ...alm grips on the combustion chamber door and open the door Burner tube cleaning procedure NOTICE Ensure that there are no glowing embers Otherwise your vacuum cleaner could be destroyed Remove any res...

Страница 50: ...unlocked on the safety temperature limiter then on the control panel with reset button 2 Fault reset on the control panel 1 STL reset Fig 42 3 Open the electrical box 4 Unscrew the protective cap 5 Re...

Страница 51: ...51 4 214 852 01...

Страница 52: ...ype Serial number Year of manufacture Place Date System installer System user Confirmation The user owner of the system herewith con rms that he has received adequate instruction in the operating and...

Отзывы: