![Hoval BioLyt 100 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/hoval/biolyt-100/biolyt-100_technical-information-installation-instructions_2170720020.webp)
3.10 Fitting the ash box and miscellaneous BioLyt (50-75)
36. Slide the ash box (50) into the screw pipe (do not forget the O-ring 50a, Fig. 21); the height of the rollers can be
adjusted by means of the nuts provided on the sides.
The ash box (50) must be aligned using the adjustable roller supports, as otherwise the connection to the
boiler will not be airtight. Ash box should be raised slightly at the wheels (a few mm); it will then be pressed
optimally against the gasket (50a) when the threaded rod (51) is tightened.
37. Lock the ash box (50) in position using the threaded rod (51); remove the nut beforehand (only serves as a trans-
port protection).
38. Hook the small front plate (52) to the side walls.
39.
Affix the adhesive type label.
Fig. 21
50
52
50a
51
53
20
4 214 852 / 01
ASSEMBLy BIOLyT (50-75)
Содержание BioLyt 100
Страница 7: ...7 4 214 852 01 NOTES...
Страница 17: ...AAT Fig 16 Fig 17 PBSu AGF WF STB HFR SZG ESF BRF DG DG PWM 17 4 214 852 01 Assembly BioLyt 50 75...
Страница 21: ...21 4 214 852 01 NOTES...
Страница 51: ...51 4 214 852 01...