![Hoval BioLyt 100 Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/hoval/biolyt-100/biolyt-100_technical-information-installation-instructions_2170720016.webp)
3.8
Fitting the probes, sensors and cables BioL
yt
(50-75)
Pass
all
the
cables
needing to
be
routed
from
the
automatic
firing
device
to
the
top
or
rear
side
of
the
boiler through the cable duct (Fig. 14). Cable outlets are provided
in the form of lateral openings
at the
corresponding points.
NOTICE
Route sensor cables and 230V cables sepa
-
rately
.
Rear of the boiler (see also Fig. 16):
-
Insert
the
flue
gas
temperature
sensor
(AGF)
into
the
immersion
sleeve
on
the
flue
gas
connector
and secure with the capillary support spring. -Route and connect
the
cables
for
the heating surface cleaner drive (HFR)
(make sure the
cables are
not trapped in the lever mechanism). -Route and connect the cable for the ash discharge screw drive (AA
T).
-
Insert
the
boile
r temperature
sensor
(WF)
from
the
automatic
firing
device
into
the
immersion
sleeve
and secure.
The safety temperature limiter sensor (STB)
will need to
be installed into this immersion
sleeve when proceeding with the installation of the casing. -Mount the return temperature sensor (BRU) on the return line. -Install the lambda probe (see Fig. 15). -Insert the cable for the induced-draught fan (SZG) (SZG; incl. extension cable).
Front side of the boiler (see also Fig. 17):
-
Route
the
cable
of
the
lower
fill
level
sensor
(PBSu)
in
the
pellet
hopper
to
the
automatic
firing
de
-
vice. -Introduce the combustion
chamber temperature sensor (BRF) into the immersion
sleeve and lock it.
-
Insert
the
feeder
screw
temperature
sensor
(ESF)
into
the
immersion
sleeve
and
fix
it
in
position
(cylinder screw M4x10). -Plug the cables for the pressure fan (DG+DG-PWM) into the fan.
After
all
the
cables
have
been
routed,
proceed
to
fit
and
secure
the
plug-in
connections
according
to
the diagram on the automatic firing device.
The cables that lead
from the burner
mecha
-
nism to
the
clamping plate must
be bundled
so that the burner can be swivelled
open wi
-
thout difficulty (see Fig. 41, page 46).
Lambda probe
Fig. 15
See also Fig. 40 and Fig. 41, chapter 6.3.2.
16
4 214 852 / 01
ASSEMBLy BIOLyT (50-75)
Содержание BioLyt 100
Страница 7: ...7 4 214 852 01 NOTES...
Страница 17: ...AAT Fig 16 Fig 17 PBSu AGF WF STB HFR SZG ESF BRF DG DG PWM 17 4 214 852 01 Assembly BioLyt 50 75...
Страница 21: ...21 4 214 852 01 NOTES...
Страница 51: ...51 4 214 852 01...