58
36) After filling the oil, turn the Drum about twenty times to smooth the mating surfaces of the
Mechanical Seals. Then, run a pressure resistance test at 1.5 - 2.0MPa to check for
leaks.
37) When replacing the Ice Guide - Side, attach the Label - PE on the contact surfaces of the
Tanks (L) and (R) for material identification.
38) Secure the Ice Guide and Switch Plate together. Be sure to position the Ice Guide over
the Switch Plate.
39) Always replace the Drier.
40) Check for leaks using nitrogen gas (10 bar) and soap bubbles.
41) After finishing an airtightness test, attach the Insulations.
42) Evacuate the system, and charge it with refrigerant. See the Nameplate for the required
refrigerant charge (See "1. [c] EVACUATION AND RECHARGE").
IMPORTANT
The following parts should be handled with care to protect their surfaces from
damage and foreign matter: Mechanical Seal, Gasket, O-ring, Oil Seal, Cord
Seal, V-ring.
43) Refit the panels in their correct position.
44) Connect the power source.
7. CONTROL WATER VALVE
1) Disconnect the power source.
2) Close the water supply tap.
3) Remove the panels.
4) Disconnect the Terminals from the Control Water Valve.
5) Remove the Cover - Reservoir Inlet from the Control Water Valve.
6) Loosen the Fitting Nut on the Control Water Valve Inlets, and remove the Control Water
Valve. Do not lose the Packings inside the Fitting Nut.
7) Install the new Control Water Valve.
Содержание TM-500AAE
Страница 4: ...iii 8 FLUSH WATER VALVE 59 9 CONTROLLER BOARD 60 10 LINE VALVE 60...
Страница 7: ...3 2 DIMENSIONS CONNECTIONS...
Страница 13: ...9 2 WIRING DIAGRAM a WIRING DIAGRAM...
Страница 14: ...10 b CONTROL BOX LAYOUT...
Страница 24: ...20 d SEQUENCE 1 Startup Water Supply Floor Mounting...
Страница 25: ...21 1 Startup Water Supply Fixed Mounting...
Страница 26: ...22 2 Startup After completion of water supply Fan Motor and Line Valve start in 2 min Floor Mounting...
Страница 27: ...23 2 Startup After completion of water supply Fan Motor and Line Valve start in 2 min Fixed Mounting...
Страница 28: ...24 3 Startup After Fan Motor and Line Valve start Compressor starts in 15 sec Floor Mounting...
Страница 29: ...25 3 Startup After Fan Motor and Line Valve start Compressor starts in 15 sec Fixed Mounting...
Страница 30: ...26 4 Startup Ice production starts Floor Mounting...
Страница 31: ...27 4 Startup Ice production starts Fixed Mounting...
Страница 32: ...28 5 Normal Operation Bin control and drain cycle 480 sec start Fixed Mounting...
Страница 33: ...29 6 Shutdown After pump down and drain cycle 480 sec start Compressor stops in 5 sec Floor Mounting...
Страница 34: ...30 6 Shutdown After pump down and drain cycle 480 sec start Compressor stops in 5 sec Fixed Mounting...
Страница 35: ...31 7 Shutdown Drain Floor Mounting...
Страница 36: ...32 7 Shutdown Drain Fixed Mounting...
Страница 57: ...53 Fig 1 Fig 2 Fig 3...