![Hoshizaki TM-500AAE Скачать руководство пользователя страница 49](http://html1.mh-extra.com/html/hoshizaki/tm-500aae/tm-500aae_service-manual_2164876049.webp)
45
3. OTHERS
PROBLEM POSSIBLE
CAUSE
REMEDY
1. Bearing worn out.
1. Replace.
2. Fan blade deformed.
2. Replace fan blade.
a) Fan Motor
(Condenser Unit)
3. Fan blade does not
move freely.
3. Replace.
1. Bearings worn out, or
cylinder valve broken.
1. Replace.
b) Compressor
2. Mounting pad out of
position.
2. Reinstall.
c) Refrigerant Lines
1. Rub or touch lines or
other surfaces.
1. Replace.
d) Gear Motor (Ice
Making)
1. Bearing or Gear
wear/damage.
1. Replace.
e) Evaporator
1. Low-side pressure too
low.
1. See if Expansion Valve Bulb is
mounted properly, and
replace the valve if necessary.
f) Gear Head
1. Damaged.
1. Replace.
[1] Abnormal noise
g) Heater
1. Broken.
1. Replace.
a) Water Valve
1. Diaphragm does not
close.
1. Clean or replace.
[2] Overflow from
Tank (Water
does not stop.)
b) Float Switch
1. Bad contacts.
1. Check for continuity and
replace.
a) Power Supply
Voltage
1. Too high or too low.
1. Connect the unit to a power
supply of proper voltage.
[3] Gear Motor
Protector
operates
frequently.
b) Evaporator Assy
1. Bearing, Drum or
Gear Head worn out.
1. Replace Bearing, Drum or
Gear Head.
Содержание TM-500AAE
Страница 4: ...iii 8 FLUSH WATER VALVE 59 9 CONTROLLER BOARD 60 10 LINE VALVE 60...
Страница 7: ...3 2 DIMENSIONS CONNECTIONS...
Страница 13: ...9 2 WIRING DIAGRAM a WIRING DIAGRAM...
Страница 14: ...10 b CONTROL BOX LAYOUT...
Страница 24: ...20 d SEQUENCE 1 Startup Water Supply Floor Mounting...
Страница 25: ...21 1 Startup Water Supply Fixed Mounting...
Страница 26: ...22 2 Startup After completion of water supply Fan Motor and Line Valve start in 2 min Floor Mounting...
Страница 27: ...23 2 Startup After completion of water supply Fan Motor and Line Valve start in 2 min Fixed Mounting...
Страница 28: ...24 3 Startup After Fan Motor and Line Valve start Compressor starts in 15 sec Floor Mounting...
Страница 29: ...25 3 Startup After Fan Motor and Line Valve start Compressor starts in 15 sec Fixed Mounting...
Страница 30: ...26 4 Startup Ice production starts Floor Mounting...
Страница 31: ...27 4 Startup Ice production starts Fixed Mounting...
Страница 32: ...28 5 Normal Operation Bin control and drain cycle 480 sec start Fixed Mounting...
Страница 33: ...29 6 Shutdown After pump down and drain cycle 480 sec start Compressor stops in 5 sec Floor Mounting...
Страница 34: ...30 6 Shutdown After pump down and drain cycle 480 sec start Compressor stops in 5 sec Fixed Mounting...
Страница 35: ...31 7 Shutdown Drain Floor Mounting...
Страница 36: ...32 7 Shutdown Drain Fixed Mounting...
Страница 57: ...53 Fig 1 Fig 2 Fig 3...