ii
[f] COMPRESSOR ----------------------------------------------------------------------------- 15
[g] EVAPORATOR (DRUM) ------------------------------------------------------------------ 15
[h] CONDENSER -------------------------------------------------------------------------------- 15
[i] CONDENSER COOLING FAN MOTOR ----------------------------------------------- 16
[j] DRIER ------------------------------------------------------------------------------------------ 16
[k] SOLENOID VALVE ------------------------------------------------------------------------- 16
[l] THERMOSTATIC EXPANSION VALVE ----------------------------------------------- 16
[m] ACCESS VALVE -------------------------------------------------------------------------- 16
[n] RECEIVER TANK --------------------------------------------------------------------------- 16
6. ELECTRIC CIRCUIT ---------------------------------------------------------------------------- 17
[a] BASIC OPERATION ------------------------------------------------------------------------ 17
[b] TIMING CHART (Floor Mounting) -------------------------------------------------------- 18
[c] TIMING CHART (Fixed Mounting) -------------------------------------------------------- 19
[d] SEQUENCE ---------------------------------------------------------------------------------- 20
[e] OPERATION BOARD ---------------------------------------------------------------------- 33
[f] CONTROLLER BOARD ------------------------------------------------------------------- 33
[g] CAPACITOR - XY FILTER ---------------------------------------------------------------- 33
[h] BIN CONTROL SWITCH (Fixed Mounting Only) -------------------------------------- 34
[i] SPOUT SWITCH (Proximity Switch) ---------------------------------------------------- 34
[j] CRANKCASE HEATER ------------------------------------------------------------------- 34
7. OPERATION BOARD -------------------------------------------------------------------------- 35
[a] USER OPERATION ------------------------------------------------------------------------ 35
[b] SERVICE OPERATION -------------------------------------------------------------------- 36
8. PROTECTORS ---------------------------------------------------------------------------------- 37
[a] INDICATION ---------------------------------------------------------------------------------- 37
[b] PROTECTORS ------------------------------------------------------------------------------ 37
9. ERROR CODES --------------------------------------------------------------------------------- 39
10. PERFORMANCE DATA ---------------------------------------------------------------------- 41
[a] TM-500AAE (Thick Ice) -------------------------------------------------------------------- 41
[b] TM-500AAE (Thin Ice) ---------------------------------------------------------------------- 42
IV. SERVICE DIAGNOSIS ---------------------------------------------------------------------------- 43
1. NO ICE PRODUCTION ------------------------------------------------------------------------- 43
2. LOW ICE PRODUCTION ---------------------------------------------------------------------- 44
3. OTHERS ------------------------------------------------------------------------------------------- 45
V. REMOVAL AND REPLACEMENT OF COMPONENTS ----------------------------------- 46
1. SERVICE FOR REFRIGERANT LINES ---------------------------------------------------- 46
[a] SERVICE INFORMATION ----------------------------------------------------------------- 46
[b] REFRIGERANT RECOVERY ------------------------------------------------------------ 47
[c] EVACUATION AND RECHARGE ------------------------------------------------------- 47
2. BRAZING ------------------------------------------------------------------------------------------ 48
3. COMPRESSOR --------------------------------------------------------------------------------- 49
4. DRIER ---------------------------------------------------------------------------------------------- 50
5. EXPANSION VALVE --------------------------------------------------------------------------- 51
6. EVAPORATOR ASSEMBLY ----------------------------------------------------------------- 52
7. CONTROL WATER VALVE ------------------------------------------------------------------ 58
Содержание TM-500AAE
Страница 4: ...iii 8 FLUSH WATER VALVE 59 9 CONTROLLER BOARD 60 10 LINE VALVE 60...
Страница 7: ...3 2 DIMENSIONS CONNECTIONS...
Страница 13: ...9 2 WIRING DIAGRAM a WIRING DIAGRAM...
Страница 14: ...10 b CONTROL BOX LAYOUT...
Страница 24: ...20 d SEQUENCE 1 Startup Water Supply Floor Mounting...
Страница 25: ...21 1 Startup Water Supply Fixed Mounting...
Страница 26: ...22 2 Startup After completion of water supply Fan Motor and Line Valve start in 2 min Floor Mounting...
Страница 27: ...23 2 Startup After completion of water supply Fan Motor and Line Valve start in 2 min Fixed Mounting...
Страница 28: ...24 3 Startup After Fan Motor and Line Valve start Compressor starts in 15 sec Floor Mounting...
Страница 29: ...25 3 Startup After Fan Motor and Line Valve start Compressor starts in 15 sec Fixed Mounting...
Страница 30: ...26 4 Startup Ice production starts Floor Mounting...
Страница 31: ...27 4 Startup Ice production starts Fixed Mounting...
Страница 32: ...28 5 Normal Operation Bin control and drain cycle 480 sec start Fixed Mounting...
Страница 33: ...29 6 Shutdown After pump down and drain cycle 480 sec start Compressor stops in 5 sec Floor Mounting...
Страница 34: ...30 6 Shutdown After pump down and drain cycle 480 sec start Compressor stops in 5 sec Fixed Mounting...
Страница 35: ...31 7 Shutdown Drain Floor Mounting...
Страница 36: ...32 7 Shutdown Drain Fixed Mounting...
Страница 57: ...53 Fig 1 Fig 2 Fig 3...