![Hoshizaki TM-500AAE Скачать руководство пользователя страница 52](http://html1.mh-extra.com/html/hoshizaki/tm-500aae/tm-500aae_service-manual_2164876052.webp)
48
7) Turn on the icemaker. Release the High-side Access Connector, and allow pressure in
the charging line to slowly enter the low side of the system. Cap off the High-side Access
Valve. When pressure reduces on the low side, disconnect the low side charging line
and cap off the Access Valve.
8) Always cap the Access Valves to prevent a refrigerant leak. Tighten the cap to a torque of
9.81 - 12.26 Nm.
9) Always thoroughly leak test all joints and valve caps.
10) Avoid charging large quantities of liquid into the low side in case of damage to the
Compressor.
Cap
Access Valve
Depressed
OPEN
2. BRAZING
DANGER
1. Refrigerant R404A itself is not flammable, explosive and poisonous. However,
when exposed to an open flame, R404A creates Phosgene gas, hazardous
in large amounts.
2. Always recover the refrigerant and store it in a proper container, if required
by an applicable law. Do not discharge the refrigerant into the atmosphere.
3. Do not use silver alloy or copper alloy containing Arsenic.
4. In its liquid state, the refrigerant can cause frostbite because of the low
temperature.
Содержание TM-500AAE
Страница 4: ...iii 8 FLUSH WATER VALVE 59 9 CONTROLLER BOARD 60 10 LINE VALVE 60...
Страница 7: ...3 2 DIMENSIONS CONNECTIONS...
Страница 13: ...9 2 WIRING DIAGRAM a WIRING DIAGRAM...
Страница 14: ...10 b CONTROL BOX LAYOUT...
Страница 24: ...20 d SEQUENCE 1 Startup Water Supply Floor Mounting...
Страница 25: ...21 1 Startup Water Supply Fixed Mounting...
Страница 26: ...22 2 Startup After completion of water supply Fan Motor and Line Valve start in 2 min Floor Mounting...
Страница 27: ...23 2 Startup After completion of water supply Fan Motor and Line Valve start in 2 min Fixed Mounting...
Страница 28: ...24 3 Startup After Fan Motor and Line Valve start Compressor starts in 15 sec Floor Mounting...
Страница 29: ...25 3 Startup After Fan Motor and Line Valve start Compressor starts in 15 sec Fixed Mounting...
Страница 30: ...26 4 Startup Ice production starts Floor Mounting...
Страница 31: ...27 4 Startup Ice production starts Fixed Mounting...
Страница 32: ...28 5 Normal Operation Bin control and drain cycle 480 sec start Fixed Mounting...
Страница 33: ...29 6 Shutdown After pump down and drain cycle 480 sec start Compressor stops in 5 sec Floor Mounting...
Страница 34: ...30 6 Shutdown After pump down and drain cycle 480 sec start Compressor stops in 5 sec Fixed Mounting...
Страница 35: ...31 7 Shutdown Drain Floor Mounting...
Страница 36: ...32 7 Shutdown Drain Fixed Mounting...
Страница 57: ...53 Fig 1 Fig 2 Fig 3...