
Chapter 9 P2P
4
Pnet I/F Module 2MLL-PSRA, 2MLL-PMEA, 2MLL-PMEB User
’s Guide
R220
Honeywell
January 2019
9.4 P2P Parameter Setting
P2P parameter setting is set in P2P screen in SoftMaster. Refer to Chapter 9.2.3 about setting order.
1) Execution of SoftMaster
If SoftMaster is executed firstly, the menu is as shown below.
[Figure 9.4.1] Basic screen of SoftMaster
Items
Contents
Remark
Project name
Writing the project name in the SoftMaster software.
-
File location
Selecting the directory to save the project.
-
PLC Series
Selecting the PLC series (2MLK, ML50, 2MLI, 2MLR)
-
CPU type
2MLK
2MLK- CPUH, CPUS
-
ML50
ML50- MLIE, MLCH, MLM, MLIH, MLIS, MLIU
2MLI
2MLI-CPUH, CPUS, CPUS/P, CPUU
2MLR 2MLR-CPUH/F, CPUH/S, CPUH/T
Project description Writing the comment about the project.
-
[Table 9.4.1]