
Chapter 9 P2P
3
Pnet I/F Module 2MLL-PSRA, 2MLL-PMEA, 2MLL-PMEB User
’s Guide
R220
Honeywell
January 2019
9.3 Operation Sequence of P2P
Operation sequence of P2P
No.
S/W applied
Operation
Details
1
N Configurator
Execute Configuration tool Execute N Configurator
2
Set Network Configuration
Refer to Chapter 7 N Configurator Setting (2MLL-
PMEB/C)
3
Connect to
communication port
Refer to Chapter 7 N Configurator Setting (2MLL-
PMEB/C)
4
Download Network
Configuration
Refer to Chapter 7 N Configurator Setting (2MLL-
PMEB/C)
5
SoftMaster
SoftMaster execution
Execute installed SoftMaster
6
Make new file
Project
New project
Setting project name and type
7
Set SoftMaster connection
Select
applicable
connection
driver
through
SoftMaster
Online
Connection settings
8
Connect to SoftMaster
SoftMaster
Online
Connect
9
IO Information Read
SoftMaster
Online
Diagnosis
I/O Information
10
Define P2P project
Specify
“P2P” on the SoftMaster screen
11
Add P2P
Right click the PLC
Add item
Communication
module setting and set the communication module,
base, slot, P2P number
12
P2P Block Setting
Double-
click the cell on the “P2P” screen
1) For Write: specify Read area (CPU area)
2) For Read: specify Save area (CPU area)
13
P2P Parameters Write
Online
Write: check applicable P2P and write
14
P2P Enable
Online
Communication module setting
Enable
Link: enable applicable P2P
[Table 9.3.1] Operation sequence of P2P