
Chapter 8 High-speed Link
9
Pnet I/F Module 2MLL-PSRA, 2MLL-PMEA, 2MLL-PMEB User
’s Guide R220
Honeywell
January 2019
9) Write the High-speed link parameter
Click “Online”
“Write” in SoftMaster, check the applicable High-speed link and then click
[OK].
[Figure 8.4.6] Screen of Write the parameter
10) Enable of High-speed link
Click “Online”
“Communication module setting”
“Enable Link” in SoftMaster, check the
applicable High-speed link and then click [Write]. If High-speed link is enabled, on the
module’s LED display High-speed LED will be on, when High-speed link starts.
[Figure 8.8] Screen of Link Enable