FRONT WHEEL/SUSPENSION/STEERING
13-26
Install the handlebars to both fork pipes while align-
ing the bosses on the handlebars with the cut outs
on the top bridge.
Tighten both handlebar pinch bolts to the specified
torque.
Install the stopper rings to the grooves of both fork
pipes.
LEFT SIDE:
Install the wire band to the fork pipe.
Route the wire properly (page 1-18).
Install the brake caliper/bracket assembly and
tighten new brake caliper mounting bolts to the
specified torque.
Install the following:
– Front wheel (page 13-17)
– Front fender (page 2-11)
Align
TORQUE: 27 N·m (2.8 kgf·m, 20 lbf·ft)
BOLT
STOPPER RING
WIRE BAND
TORQUE: 30 N·m (3.1 kgf·m, 22 lbf·ft)
CALIPER/BRACKET ASSEMBLY
BOLTS
Содержание CBR125R
Страница 38: ...MEMO...
Страница 56: ...MEMO...
Страница 84: ...MEMO...
Страница 94: ...FUEL SYSTEM PGM FI 5 2 FUEL SYSTEM PGM FI COMPONENT LOCATION 1 2 N m 0 1 kgf m 0 9 lbf ft...
Страница 213: ...9 1 9 9 CYLINDER PISTON COMPONENT LOCATION 9 2 SERVICE INFORMATION 9 3 TROUBLESHOOTING 9 3 CYLINDER PISTON 9 4...
Страница 214: ...CYLINDER PISTON 9 2 CYLINDER PISTON COMPONENT LOCATION...
Страница 224: ...MEMO...
Страница 248: ...ALTERNATOR STARTER CLUTCH 11 2 ALTERNATOR STARTER CLUTCH COMPONENT LOCATION 64 N m 6 5 kgf m 47 lbf ft...
Страница 260: ...CRANKSHAFT BALANCER TRANSMISSION 12 2 CRANKSHAFT BALANCER TRANSMISSION COMPONENT LOCATION...
Страница 282: ...MEMO...
Страница 392: ...MEMO...
Страница 416: ...MEMO...
Страница 417: ...20 1 20 20 WIRING DIAGRAMS ED E F II G type 20 3 CM type 20 4 U type 20 5...
Страница 428: ...MEMO...