![Honda CBR125R Скачать руководство пользователя страница 292](http://html1.mh-extra.com/html/honda/cbr125r/cbr125r_owners-manual_2157112292.webp)
FRONT WHEEL/SUSPENSION/STEERING
13-10
Install the clutch lever bracket, holder ("UP" mark
facing up) and bolts.
Align the end of the clutch lever bracket with the
punch mark on the handlebar, and tighten the upper
bolt first, then the lower bolt.
Connect the clutch switch connectors.
Apply grease to the throttle pipe sliding area of the
right handlebar.
Install the throttle pipe to the right handlebar.
Connect the throttle cable end to the throttle pipe.
Install the right handlebar switch housing while
aligning its locating pin with the hole on the handle-
bar.
CLUTCH LEVER BRACKET
"UP" MARK
BOLTS
Align
HOLDER
CONNECTORS
THROTTLE PIPE
THROTTLE PIPE
THROTTLE CABLE
THROTTLE HOUSING
Align
Содержание CBR125R
Страница 38: ...MEMO...
Страница 56: ...MEMO...
Страница 84: ...MEMO...
Страница 94: ...FUEL SYSTEM PGM FI 5 2 FUEL SYSTEM PGM FI COMPONENT LOCATION 1 2 N m 0 1 kgf m 0 9 lbf ft...
Страница 213: ...9 1 9 9 CYLINDER PISTON COMPONENT LOCATION 9 2 SERVICE INFORMATION 9 3 TROUBLESHOOTING 9 3 CYLINDER PISTON 9 4...
Страница 214: ...CYLINDER PISTON 9 2 CYLINDER PISTON COMPONENT LOCATION...
Страница 224: ...MEMO...
Страница 248: ...ALTERNATOR STARTER CLUTCH 11 2 ALTERNATOR STARTER CLUTCH COMPONENT LOCATION 64 N m 6 5 kgf m 47 lbf ft...
Страница 260: ...CRANKSHAFT BALANCER TRANSMISSION 12 2 CRANKSHAFT BALANCER TRANSMISSION COMPONENT LOCATION...
Страница 282: ...MEMO...
Страница 392: ...MEMO...
Страница 416: ...MEMO...
Страница 417: ...20 1 20 20 WIRING DIAGRAMS ED E F II G type 20 3 CM type 20 4 U type 20 5...
Страница 428: ...MEMO...