FUEL SYSTEM (PGM-FI)
5-56
IACV INSTALLATION
Turn the slide valve clockwise until lightly seated on
IACV.
Install the IACV aligning its groove with the slide
valve housing pin.
Install the setting plate while aligning the cut-out
with the lug on the IACV as shown.
Install and tighten the IACV setting plate torx screws
to the specified torque.
INSTALLATION
Connect the throttle cable to the throttle drum and
throttle cable stay.
SLIDE VALVE
GROOVE
PIN
IACV
TORQUE: 2.1 N·m (0.2 kgf·m, 1.5 lbf·ft)
SETTING PLATE
TORX SCREWS
Align
THROTTLE DRUM
THROTTLE CABLE
Содержание CBR125R
Страница 38: ...MEMO...
Страница 56: ...MEMO...
Страница 84: ...MEMO...
Страница 94: ...FUEL SYSTEM PGM FI 5 2 FUEL SYSTEM PGM FI COMPONENT LOCATION 1 2 N m 0 1 kgf m 0 9 lbf ft...
Страница 213: ...9 1 9 9 CYLINDER PISTON COMPONENT LOCATION 9 2 SERVICE INFORMATION 9 3 TROUBLESHOOTING 9 3 CYLINDER PISTON 9 4...
Страница 214: ...CYLINDER PISTON 9 2 CYLINDER PISTON COMPONENT LOCATION...
Страница 224: ...MEMO...
Страница 248: ...ALTERNATOR STARTER CLUTCH 11 2 ALTERNATOR STARTER CLUTCH COMPONENT LOCATION 64 N m 6 5 kgf m 47 lbf ft...
Страница 260: ...CRANKSHAFT BALANCER TRANSMISSION 12 2 CRANKSHAFT BALANCER TRANSMISSION COMPONENT LOCATION...
Страница 282: ...MEMO...
Страница 392: ...MEMO...
Страница 416: ...MEMO...
Страница 417: ...20 1 20 20 WIRING DIAGRAMS ED E F II G type 20 3 CM type 20 4 U type 20 5...
Страница 428: ...MEMO...