71
Section 3 - Operation
NOTICE:
YOUR INITIAL FORWARD SPEED SETTING SHOULD ALWAYS BE
SET TO A SPEED SLIGHTLY FASTER THAN THE ANTICIPATED
BLASTING SPEED TO REDUCE THE POSSIBILITY FOR
PAVEMENT DAMAGE AS BLASTING BEGINS.
8. With vehicle moving at the desired speed, turn the
DUMP VALVE switch on to activate the dump valve
and begin water blasting operations.
Remember, never close the dump valve while
truck is sitting still with the blast head on
the ground.
Visual Impact Guide
Paint On Concrete /Thermoplastic On Asphalt
CAUTION
THE UHP PUMP IS DIRECTLY DRIVEN BY THE AUXILIARY
ENGINE PTO AND WILL BE DAMAGED IF THE PTO IS
ENGAGED WITHOUT TURNING ON THE CHARGE PUMP.
MAKE SURE THE AUXILIARY ENGINE IS RUNNING AT
OPERATING RPM AND THE CHARGE PUMP IS ACTIVATED
TO PROVIDE WATER TO THE UHP PUMP FOR COOLING AND
LUBRICATION WHENEVER THE AUXILIARY ENGINE PTO
CLUTCH IS ENGAGED.
Содержание SK5500
Страница 2: ......
Страница 80: ...80 NOTES...
Страница 135: ...135 Section 5 Scheduled Maintenance Hog Technologies...
Страница 141: ...141 Appendix 2 Tools Spare Parts...
Страница 142: ...142 Appendix 2 Tools Spare Parts...
Страница 143: ...143 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM...
Страница 151: ...151 Appendix 4 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 68 Nozzle Calculation Sheet...
Страница 152: ...152 NOTES...
Страница 159: ......
Страница 160: ......