67
Section 3 - Operation
4.
Slowly open the source valve to begin filling the
tank.
5. Open the drain valve on the passenger side of the
tank for several seconds to flush out debris that
may have accumulated on the bottom of the tank,
then close the valve.
6.
Monitor the tank sight glass closely during fill
operations and close the source valve just before
the tank is completely filled.
7.
Close the water tank fill valve, release the cam-
locks and disconnect the fill hose from the fitting.
Clean Water Tank Sight Gauge
Clean Water Tank Drain Valve
8.
Remove the fill hose from the water source and
drain the hose.
9. Store the hose in a clean, safe location.
CAUTION
OPERATORS MUST ALWAYS MONITOR THE TANK CLOSELY
DURING FILLING OPERATIONS AS THE FLOW OF WATER
FROM A HYDRANT OR OTHER HIGH VOLUME SOURCE
CAN BE FAR GREATER THAN THE FLOW CAPACITY OF THE
TANK AIR VENT. OVERFILLING WILL CAUSE EXCESSIVE
PRESSURE AND DAMAGE TO THE TANK.
Содержание SK5500
Страница 2: ......
Страница 80: ...80 NOTES...
Страница 135: ...135 Section 5 Scheduled Maintenance Hog Technologies...
Страница 141: ...141 Appendix 2 Tools Spare Parts...
Страница 142: ...142 Appendix 2 Tools Spare Parts...
Страница 143: ...143 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM...
Страница 151: ...151 Appendix 4 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 68 Nozzle Calculation Sheet...
Страница 152: ...152 NOTES...
Страница 159: ......
Страница 160: ......